871 South Green Street
Tupelo, MS 38804
Get Directions

P O Box 1602
Tupelo, MS 38802

Office: (662) 841-0995
Fax: (662) 841-0810

  • Environmental
  • Tank Compliance
  • SPCC Plans
  • Solid Waste
  • Stormwater
  • Assessments
  • Remediation
  • Wasterwater
  • Engineering Services
  • Geological Services
  • Read More…
  • Fueling Systems
  • Tank Removals
  • Tank & Pipe Installs
  • Cathodic Protection
  • Leak Detector Test
  • Veeder Root
  • Incon Programming
  • Fuel Master
  • Pneumercator
  • Hydrostatic Testing
  • Tank & Line Testing
  • STP Repair & Replace
  • Read More…
  • Construction
  • Site Work
  • Utility Installation
  • Building Construction
  • Erosion Control
  • Remodels
  • Concrete
  • Read More…

 

Cobb Corporate News

Projects Currently Underway

William E Stewart Municipal Airport - Jackson, AL - $191,000 contract - Construct a fuel farm.

Mobile Area Water and Sewer Authority, Mobile, AL - $494,000 contract – Developing a 1.5 acre undeveloped property into a new parking and fueling facility. Transferring two existing 10,000 gallon above ground storage tanks to this facility, install new underground and aboveground piping, sumps , dispensers, canopy, storm drains, paving, curb and gutter, landscaping.

Brewton Municipal Airport - Brewton, AL - $183,000 contract - Construct a fuel farm.

Consolidated Rental Car Facility - New Orleans, LA - $1,100,000 contract – Installing two new double wall 10,000 gallon aboveground storage tanks at three separate rental car facilities near the New Orleans International Airport. All new underground and aboveground product piping, new dispensers at each facility, aboveground piping, sumps and tank gauging systems at each facililty.
Metropolitan Atlanta Rapid Transit Authority – Atlanta, GA - Install $450,000 groundwater recovery and treatment at the Brady Bus facility. 
John Turk Power Plant – Fulton, AR - $430,000 contract – Completed the design, and will build a new commercial fueling facility at a new power plant presently under construction. This will involve three new double wall 10,000 gallon aboveground fuel tanks, underground and aboveground product piping, tank monitoring systems, dispensers, concrete pads, concrete fuel tank truck fueling area and electrical.
Douglas Municipal Airport - Douglas, GA - $476,000 contract to install AVGAS and Jet Fuel Farm with airport apron improvements under a grant by the Georgia Department of Transporation. 
Sam’s Club Fuel Station – Dallas, TX - $400,000 contract – Will install three new double wall 20,000 gallon fiberglass underground storage tanks, product piping, vent lines, dispensers, kiosk, foundations, concrete paving, electrical and startup.
Martin Campbell Field - Copperhill, TN - $176,000 - Construct a fuel farm.
Recent Projects
Atlanta Federal Bureau of Prisons, Atlanta, Georgia – Completed Removed two existing 30,000 gallon aboveground vertical tanks, demolished concrete pad, installed new concrete pad, and two new 12,000 gallon aboveground Con-Vault double wall tanks, installed new aboveground product piping, tank appurtenances, and a new Incon Tank gauging system. All for a secondary power system at the prison.
Brookhaven Regional Airport, Brookhaven, MS – Removed four existing underground storage tanks and installed two new 10,000 gallon aboveground storage tanks and all associated aboveground piping, filters, pumps and monitoring systems for a new Avgas and Jet Fuel Systems.
Sam’s Club, Nichalousville, KY - Installed three new 20,000 gallon double walled underground storage tanks, new OPW Flex double wall underground product piping, A.O Smith Fiberglass piping for Stage II Vapor Recovery, new sumps, vents, Kiosk building, foundations, storage drains and concrete. This was a turn key gas station project for Wal-Mart.
Sam’s Club – Hot Springs, AR - Installed three new 20,000 gallon double walled underground storage tanks, new OPW Flex double wall underground product piping, A.O Smith Fiberglass piping for Stage II Vapor Recovery, new sumps, vents, Kiosk building, foundations, storage drains and concrete. This was a turn key gas station project for Wal-Mart.
McCharen Field Airport – West Point, MS – Installed two new aboveground double wall aboveground storage tanks, concrete pad, aboveground fuel piping, Incon Tank Gauging System and Card Reader for a new AvGas and Jet Fuel System.
Ditto Landing Marina – Huntsville, AL – Installed one new compartmentalized underground storage tank, four new on the piers dispensers, product piping, tank gauging system, concrete, startup and turnover.
Kroger Gas Facility – Dyersburg, TN – Constructed a groundup gas station facility for Kroger Food Stores. Involved demolition, canopy, kiosk, two new 20,000 gallon fiberglass double wall underground storage tanks, four dispensers, OPW Flex product piping, vent lines, concrete paving, startup and turnover.